References
Hotels, municipalities, and businesses rely on e-bike charging stations from bike-energy.
We have been developing and manufacturing e-bike charging stations in Austria since 2011. Today, we operate one of the densest charging networks for e-bikes in Europe.
Municipalities & Hosts
Spessart Nature Park
Six charging stations in front of the main entrance, wrapped in the resort's corporate colors.
The resort was looking for a charging solution that would complement the architecture while also serving multiple guests at the same time. The stations were placed right at the main entrance, so they also serve as a visible symbol of sustainable hospitality. Through the app, the resort is now part of the bike-energy network.
Commissioning
2020
Charging stations
320
Charging station
POINT & LINE & TOWER
Hospitality Industry
Kempinski Hotel
Six charging stations in front of the main entrance, wrapped in the resort's corporate colors.
The resort was looking for a charging solution that would complement the architecture while also serving multiple guests at the same time. The stations were placed right at the main entrance, so they also serve as a visible symbol of sustainable hospitality. Through the app, the resort is now part of the bike-energy network.
Businesses
Bosch Hallein
With 56 charging stations for employees, Bosch Hallein is sending a clear message: Anyone who rides an e-bike to work will find the right infrastructure on site. In this way, the company actively promotes the health and well-being of its workforce while also enhancing its appeal as a modern employer. Through the bike-energy network, the daily commute by e-bike becomes as natural as it is convenient.
Municipalities & Hosts
Flims & Laax
The region wanted to offer its guests a seamless e-bike experience—from the villages to the mountain destinations. A comprehensive network of charging stations was installed at strategic locations near mountain railways, hotels, and scenic overlooks. All locations can be easily found through the bike-energy app, making Flims Laax a model region for electric mountain tourism.
Municipalities & Hosts
Hochkönig
As early as 2014, the Hochkönig region recognized the great potential of summer tourism—and consistently focused on e-bikers as a growing target group. Even back then, a network of charging stations was established collaboratively to provide guests with a reliable range and freedom of movement in the mountains. Thanks to this early commitment, the Hochkönig region is now one of the pioneering regions in Alpine e-bike tourism and is an integral part of the bike-energy network.
Municipalities & Hosts
Mürzzuschlag
With 84 charging points, the Mürzzuschlag region is sending a clear message: summer tourism and e-bike visitors are clearly the focus. The comprehensive network ensures short distances between charging stations, making tours in the region easy to plan and enjoyable. All locations can be easily found via the bike-energy app—positioning Mürzzuschlag as an attractive destination for the growing e-bike tourism market.
the network
Installed throughout Europe.
Each point on the map represents an installed bike-energy charging station.
Every installation adds value to the network—for e-bike riders and operators alike.
+3.000
Charging stations
+15
Countries
Frequently asked questions
A bike-energy e-bike charging station requires only a standard 230V outlet—just like a regular electrical outlet. Electric car charging stations require a 400V power supply. Since all charging stations are delivered fully pre-assembled, no special installations or additional wiring are necessary. The connection should be made by an electrician.
Yes, bike-energy charging stations are eligible for funding in many regions—at the federal, state, and municipal levels. Funding is available, among other things, through active mobility programs, klimaAktiv initiatives, and municipal tourism projects.
The installation effort for a bike-energy charging station is minimal—all you need is a 230V outlet. All stations are delivered fully pre-assembled and, thanks to optional stands (POINT & LINE models) or a base plate (TOWER model), can be set up freestanding without requiring a foundation. In most cases, no structural preparations, excavation work, or special fixtures are necessary. The electrical connection must be performed by a qualified contractor.
Ja, alle bike-energy Ladestationen sind vollständig wetterfest und robust gegen Vandalismus konstruiert. Sie sind „Made in Austria” mit hochwertigen Materialien gefertigt, TÜV-geprüft, CE-konform und ISO 9001 zertifiziert. Das Laden ist bei jeder Witterung – Regen, Schnee oder Hitze – ohne Risiko möglich. Die robuste Bauweise hat sich seit 2011 in über 3.000 installierten Stationen in 19 Ländern bewährt.
Yes, multiple bike-energy charging stations can be easily connected to form a regional network—both technically via bike-energy CONNECT and through the bike-energy app. This creates a comprehensive e-bike charging infrastructure that guides visitors through the region and connects tourism businesses with one another. Through online monitoring, operators can centrally manage all locations, analyze charging activity, and deploy OTA updates. Ideal for tourism regions, cities, and mountain rail networks.
Yes, bike-energy charging stations have a modular design and allow multiple e-bikes to be charged simultaneously. Depending on the model—POINT, LINE, or TOWER—each station can be configured with 2 to 5 charging points. Thanks to over 25 compatible charging ports, e-bikes from different brands can be charged in parallel and independently of one another. The modular system can be expanded at any time as demand at the location grows.
Fire hazards at bike-energy charging stations are reliably prevented by intelligent charging electronics with multiple safety shut-off mechanisms. The charging cables (depending on the manufacturer) communicate with the station via an integrated data storage device (EEPROM)—current flows only once the voltage and battery type have been correctly detected. If values fall outside the safe range, the system shuts down immediately. Unlike charging with private home chargers plugged into unprotected outlets, bike-energy offers a certified, TÜV-tested safety concept.
Implementing a regional charging infrastructure typically takes between 3 and 12 weeks—depending on the number of locations and the equipment. Delivery of a single charging station takes up to 3 weeks, depending on the configuration and custom wrapping. From consultation to site planning, for larger regional projects, we’re happy to create a detailed timeline—contact us for a no-obligation quote.
How to Get Started
From the first conversation to the first shipment.
1
Inquiry
Please check in with your location.
2
Consulting
We'll review, plan, and get back to you within 48 hours.
3
Installation
Delivered, set up, and connected. Your location is now part of the network.
Ready for your project?
We'll analyze your location and show you the right configuration. No obligation.