POINT
One to four bikes, mounted on the wall or freestanding.
2–4 CHARGING STATIONS
OVER 30 E-BIKE BRANDS
CUSTOMIZABLE
100% MADE IN AUSTRIA
POINT tailored to your needs.
The POINT adapts to your location.
Whether it's branding, power supply, or existing infrastructure.
Your brand on the charging station
Every POINT can be wrapped to match your corporate design—colors, logo, regional motifs. The charging station becomes a visible part of your brand presence.
The right accessories for every need.
From specialized mounts to freestanding columns—expand your charging station in a modular way and tailor it perfectly to your location.
Smart Connectivity and Management.
Monitor and control your charging stations digitally. With our connectivity solutions, you have full control over utilization and maintenance.
POINT at various locations.
Four typical use cases. Four different requirements. The same system.
Every POINT becomes a system.
The LINE is connected to the network via CONNECT. Remote monitoring, automatic updates, visibility in the app. The charging cable makes it compatible with over 30 e-bike brands. Together, a single station becomes a system.
Frequently asked questions
A bike-energy e-bike charging station requires only a standard 230V outlet—just like a regular electrical outlet. Electric car charging stations require a 400V power supply. Since all charging stations are delivered fully pre-assembled, no special installations or additional wiring are necessary. The connection should be made by an electrician.
Yes, bike-energy charging stations are eligible for funding in many regions—at the federal, state, and municipal levels. Funding is available, among other things, through active mobility programs, klimaAktiv initiatives, and municipal tourism projects.
The installation effort for a bike-energy charging station is minimal—all you need is a 230V outlet. All stations are delivered fully pre-assembled and, thanks to optional stands (POINT & LINE models) or a base plate (TOWER model), can be set up freestanding without requiring a foundation. In most cases, no structural preparations, excavation work, or special fixtures are necessary. The electrical connection must be performed by a qualified contractor.
Ja, alle bike-energy Ladestationen sind vollständig wetterfest und robust gegen Vandalismus konstruiert. Sie sind „Made in Austria” mit hochwertigen Materialien gefertigt, TÜV-geprüft, CE-konform und ISO 9001 zertifiziert. Das Laden ist bei jeder Witterung – Regen, Schnee oder Hitze – ohne Risiko möglich. Die robuste Bauweise hat sich seit 2011 in über 3.000 installierten Stationen in 19 Ländern bewährt.
Yes, multiple bike-energy charging stations can be easily connected to form a regional network—both technically via bike-energy CONNECT and through the bike-energy app. This creates a comprehensive e-bike charging infrastructure that guides visitors through the region and connects tourism businesses with one another. Through online monitoring, operators can centrally manage all locations, analyze charging activity, and deploy OTA updates. Ideal for tourism regions, cities, and mountain rail networks.
Yes, bike-energy charging stations have a modular design and allow multiple e-bikes to be charged simultaneously. Depending on the model—POINT, LINE, or TOWER—each station can be configured with 2 to 5 charging points. Thanks to over 25 compatible charging ports, e-bikes from different brands can be charged in parallel and independently of one another. The modular system can be expanded at any time as demand at the location grows.
Fire hazards at bike-energy charging stations are reliably prevented by intelligent charging electronics with multiple safety shut-off mechanisms. The charging cables (depending on the manufacturer) communicate with the station via an integrated data storage device (EEPROM)—current flows only once the voltage and battery type have been correctly detected. If values fall outside the safe range, the system shuts down immediately. Unlike charging with private home chargers plugged into unprotected outlets, bike-energy offers a certified, TÜV-tested safety concept.
Implementing a regional charging infrastructure typically takes between 3 and 12 weeks—depending on the number of locations and the equipment. Delivery of a single charging station takes up to 3 weeks, depending on the configuration and custom wrapping. From consultation to site planning, for larger regional projects, we’re happy to create a detailed timeline—contact us for a no-obligation quote.
